The M Train Is Fully Functional in Bushwick Today After Months of Renovation

The "M" in Monday is for Myrtle Avenue.

The M Train Is Fully Functional in Bushwick Today After Months of Renovation

The M train is back in action.

Train service resumed between Myrtle-Wyckoff and Myrtle-Broadway Avenue stations at 5 a.m. today after the MTA completed an eight-month project to restore the Myrtle Viaduct and Fresh Pond Bridge, which are both over a century old.

The $163 million project revamped decrepit structures along the M line, which connects Bushwick and Queens; installed low-vibration tracks to reduce noise for nearby properties; added new third rails and stronger, newly engineered track ties; and replaced all local signal equipment and cables. The restorative work was also done to increase M train service during the L train shutdown slated for April 2019.

AdvertisementsFrom Bushwick Daily

Bushwick Daily Membership

The legendary tote, the newsletter, and local news that answers to the neighborhood.

Become a Member

There is still speculation about whether a souped-up M train is the answer to the woes of around 225,000 riders who will be displaced during the shutdown. Commuters today tweeted out some disheartening stuff:




Others were more positive:

AdvertisementsFrom Bushwick Daily

Independent journalism

Local news needs locals. Help keep Bushwick Daily going.

Support Us



Follow us on FacebookInstagram, and Twitter

AdvertisementsFrom Bushwick Daily

Reach Bushwick

Put your business in front of 100,000+ New Yorkers a month.

Advertise With Us
Advertise with Bushwick Daily

Reach all of New York.

Written in Bushwick, read across all five boroughs since 2009.

100,000+ readers a month 500,000+ on Instagram All five boroughs
Advertise with us
Support Bushwick Daily — become a member